LCM Digital for planning the planning

Projekt WS138 in Stuttgart

HERKOMMER ARCHITEKTEN, STUTTGART

The WS138 building project in Stuttgart involves the conversion of a school building into a residential building. On three existing floors and a newly developed attic, approx. 990 m² of living space, distributed over 13 residential units, is to be realized. The focus is on interfering as little as possible with the existing structure and creating economical living space with quality of stay.

Project Duration:

March 2022 - June 2024

Project Type:

Conversion to residential building

Specifics of the project

Close scheduling coordination with the neighboring construction project required, as e.g. joint use of the construction site facility is planned

When building in existing structures, impediments during the project that are difficult to predict can occur under certain circumstances, e.g. due to unexpected building fabric, unknown as-built structural analysis, etc. The development of new solutions can have an impact on deadlines.

What Herkommer Architekten
especially appreciate:

Scheduling and process planning

Clear visualization of the planning of the planning on the timeline

Intuitive and fast scheduling and process planning via drag & drop

Early detection of conflicts and possible effects on the construction process

What colleagues from Herkommer Architekten say

Simon Tappe Managing Director Herkommer Architekten

"With the help of operating functions such as "drag and drop", the program is intuitive to use and easy to learn. The creation of a schedule succeeds quickly, so that an overview of the project flow is created at an early stage."

    Connect all participants into one team.

    Arrange your personal product demonstration today. 

    Start with own project or example project

    Personalized and tailored to your needs

    incl. 100-days satisfaction guarantee

    Project Managers

    Planners

    Superintendent

    Trades